Titan Mining (TII) Q2 2026 earnings review

Record Zinc Quarter Funds Critical Mineral Ambitions

Titan delivered a record-breaking quarter, with revenue accelerating 57% YoY to $25.7M and Adjusted EBITDA nearly quadrupling to $9.6M. The legacy zinc business is firing on all cylinders: production rebounded sharply from Q1 outages, unit costs dropped, and realized zinc prices climbed to $1.57/lb. This cash engine is perfectly timed to fund Titan's rapid pivot toward U.S. domestic critical minerals. The Kilbourne graphite project secured major commercial validation with a conditional supply agreement and U.S. Army support. However, underlying cash generation is heavily consumed by expensed growth investments, leaving operating cash flow nearly flat.

๐Ÿ‚ Bull Case

Zinc Leverage is Expanding Margins

With C1 cash costs dropping to $0.88/lb and spot zinc prices surging near $1.70/lb (a 4-year high), Titan's profit margins are accelerating. The Q1 hoist issues are fully resolved, paving the way for a highly profitable second half.

Graphite Commercialization De-Risked

Securing a conditional supply agreement with RHI Magnesita and a non-binding LOI with a U.S. aerospace manufacturer proves industrial demand for Kilbourne's output. Conditional selection by the U.S. Army for a purification plant adds massive federal backing.

๐Ÿป Bear Case

Severe Cash Conversion Gap

Despite reporting $9.6M in Adjusted EBITDA, operating cash flow after working capital was just $0.3M. The company is burning through its zinc cash to fund $4.8M in quarterly expensed growth initiatives for graphite and germanium.

High Execution Risk

Management is simultaneously running a full-scale zinc mine, advancing a 40,000 tpa graphite feasibility study, commissioning a graphite demonstration plant, and evaluating a new germanium recovery circuit. Operational focus could easily slip.

โš–๏ธ Verdict: ๐ŸŸข

Bullish. The core legacy business is operating at peak efficiency just as macro tailwinds (zinc prices) accelerate. This provides the exact financial runway needed to advance the high-upside U.S. critical minerals portfolio without immediate, massive equity dilution.

Key Themes

DRIVER ๐ŸŸข

Zinc Operations: High-Grade Rebound Accelerating Margins

Zinc production reversed Q1's weakness, accelerating 23% sequentially to 17.5 million lbs. By shifting equipment to the higher-grade Mud Pond Apron, Titan completely recovered the Q1 hoisting shortfall. More importantly, C1 cash costs plummeted to $0.88/lb. Combined with average provisional zinc prices of $1.57/lb, the asset is generating immense gross margin to fund corporate expansion.

DRIVER NEW ๐ŸŸข๐ŸŸข

Graphite Commercial Order Book taking Shape

The Kilbourne Graphite Project is rapidly advancing from a development concept to commercial reality. Titan announced two major agreements: a conditional supply deal with global refractory leader RHI Magnesita and an LOI with a U.S. aerospace manufacturer. Furthermore, laboratory tests confirmed battery-grade spherical graphite across the full processing chain, a critical milestone for accessing electric vehicle supply chains.

THEME NEW ๐ŸŸข๐ŸŸข

U.S. Defense Department Validation

In a massive win for its domestic critical minerals strategy, Titan received Conditional Selection Notices from the U.S. Army. The plan involves building and operating the Kilbourne graphite purification plant directly on Army property under Enhanced Use Leases. Combined with the EXIM Bank's $120M financing interest, Titan's projects are deeply embedded in U.S. federal onshoring initiatives.

CONCERN ๐Ÿ”ด

Weak Cash Conversion Validates Capital Intensity

While Adjusted EBITDA was $9.6M, operating cash flow after working capital was a meager $0.3M. This gap is stable but concerning. The culprit: $4.8M spent in Q2 on "growth initiatives" (exploration, graphite demonstration facility, feasibility study) which are expensed immediately. The company's free cash flow profile remains negative, relying on the $29.1M liquidity buffer.

DRIVER ๐ŸŸข

Germanium Byproduct Advancing

Following Q1's announcement of a cooperation agreement with Teck Resources, Q2 property-wide sampling confirmed district-wide germanium enrichment. This represents a low-capital, high-value opportunity to extract a critical mineral from existing zinc process streams, directly challenging Chinese supply dominance.

CONCERN NEW ๐Ÿ”ด

Retroactive Cost Revisions

Management revised Q1 2026 C1 cash costs up by $0.06/lb (to $1.04) and AISC up by $0.05/lb (to $1.06) to "align with definitions." While Q2 costs were excellent, retroactive cost restatements on the legacy asset undermine confidence in financial controls just as capital spending is ramping up.

Other KPIs

C1 Cash Costs $0.88 per pound

Accelerating improvement. Costs dropped 15% sequentially from the revised Q1 figure of $1.04/lb, landing comfortably below the low end of the full-year guidance range ($0.93-$1.01). Driven by higher grades from the Mud Pond Apron.

Net Debt $12.8 million

Stable quarter-over-quarter, but down 47% from $24.2 million a year ago. The company maintains $29.1 million in available liquidity (including $15.8M of undrawn EXIM capacity), providing adequate cushion for the ongoing feasibility studies.

Guidance

FY26 Adjusted EBITDA $20 - $28 million

Stable outlook reaffirmed. With $13.6M achieved in H1, the midpoint ($24M) implies H2 EBITDA of $10.4M. Given current spot zinc prices near $1.70/lb (well above the H1 average), this guidance looks highly conservative and poised for a beat.

FY26 Zinc Production 62 - 66 million pounds

Stable trajectory. H1 output was 31.7 million pounds. The second half requires 30.3 to 34.3 million pounds, perfectly aligning with the current operating run-rate, especially with operations set to resume in the N2D zone in Q4.

FY26 AISC (All-in Sustaining Costs) $1.07 - $1.17 per pound

Decelerating margin profile expected in H2. H1 AISC was $1.01/lb. Management explicitly stated that sustaining capital expenditures are weighted toward the second half of the year, which will drive unit costs higher and narrow margins despite the production consistency.

Key Questions

Commercial Conversion Timeline

You have a conditional supply agreement and a non-binding LOI for graphite. What are the specific technical milestones required by these partners to transition these into binding, take-or-pay commercial offtake contracts?

Cash Flow vs EBITDA Gap

Adjusted EBITDA was a record $9.6M, but operating cash flow was only $0.3M due to growth expensing and working capital. Can we expect working capital to normalize in H2, or will the ramp-up in feasibility study costs continue to suppress actual cash generation?

Germanium Capital Requirements

As the Teck Resources germanium evaluation progresses, what is the estimated cap-ex envelope required to amend the existing zinc process streams for commercial germanium recovery, assuming the current test work is successful?