Stabilis (SLNG) Q2 2026 earnings review

Transition Year Pain: Volumes Trough While Vessel Charter Costs Crush Earnings

Stabilis is navigating a brutal gap year. With two major contracts rolling off in late 2025, Q2 2026 revenue fell 31% YoY to $11.9M, though it ticked up sequentially from Q1's $10.4M bottom. The bottom line was decimated by a $2.9M termination expense for an unutilized vessel charter, dragging net loss to $4.6M. The entire investment thesis now hinges on a massive 2027 data center contract, which management promises will drive full-year revenues well over $100M. Until then, the company is surviving on customer cash advances to fund operations.

๐Ÿ‚ Bull Case

Data Center Inflection Point

A massive behind-the-meter LNG power contract for a U.S. data center begins in Q1 2027, with a smaller commissioning contract starting in Q3 2026. This creates a clear line of sight to >$100M in revenue for 2027.

Aerospace Momentum Accelerating

Aerospace revenue grew an impressive 71% YoY in Q2, validating the company's expansion into commercial space flight fueling and somewhat buffering the loss of legacy marine/power contracts.

๐Ÿป Bear Case

Vessel Execution Failure

Management failed to sub-charter a non-Jones Act vessel, resulting in a total $4.3M drag ($1.5M in Q1, $2.9M termination in Q2). This highlights severe execution risks in their logistics strategy.

Cash Flow Illusion

While operating cash flow was positive $7.1M, $5.0M of this came from customer advance payments. The core business is heavily burning cash while waiting for 2027.

โš–๏ธ Verdict: ๐Ÿ”ด

Bearish. The sequential revenue improvement is a positive sign that the bottom is in, but the massive earnings miss driven by the botched vessel charter undermines management's execution credibility. The stock is a pure 2027 data-center play right now, carrying significant interim risk.

Key Themes

CONCERN NEW ๐Ÿ”ด๐Ÿ”ด

The Vessel Charter Debacle

In Q1, management incurred $1.5M in costs for an idle marine vessel charter, assuring investors they were finalizing a sub-charter to neutralize the expense. In Q2, they capitulated, terminating the charter entirely for an additional $2.9M hit. This $4.3M total blunder represents nearly half of the company's entire gross profit from 2025, wiping out valuable liquidity during a transition year.

DRIVER NEW ๐ŸŸข

Data Centers Bridging the Gap

Data center power demand is now the primary growth engine. While the multi-year anchor contract doesn't start until Q1 2027, Stabilis successfully secured a six-month LNG supply agreement for commissioning an additional U.S. data center. This new contract starts in Q3 2026 and provides crucial bridge revenue to support the H2 2026 recovery narrative.

DRIVER ๐ŸŸข

Aerospace Segment Surges

Aerospace revenues accelerated, growing 71% YoY in Q2 (up from 31% YoY growth in Q1). As commercial space launches increase, Stabilis is proving its ability to capture high-margin, specialized fuel demand, making aerospace the only reliable growth pillar while marine and power segments reset.

CONCERN ๐Ÿ”ด

Galveston LNG Project Stalled

The highly-touted Galveston LNG facility remains 'in development'. Following the loss of a key offtake agreement in Q1 due to financing modifications, the company only announced a Coast Guard Letter of Recommendation in Q2. Without replacement offtakers secured, the Final Investment Decision (FID) appears indefinitely delayed, pushing back any maritime growth thesis.

Other KPIs

Operating Cash Flow (26Q2) $7.1 million

Superficially strong, but highly deceptive. The $7.1M includes $5.0M in customer advance payments for the 2027 data center contract (building on $15.0M received in Q1). Excluding these advances, the core business is burning cash due to lower volumes and high SG&A.

Adjusted EBITDA (26Q2) $0.1 million

Reversing from negative $0.7M in Q1 2026, but still drastically down from $1.5M a year ago. The company adds back the $2.9M vessel charter termination to achieve this positive figure, highlighting extremely thin underlying operating margins.

Available Liquidity (26Q2) $18.9 million

Up from $17.2M in Q1. However, a significant portion of the cash balance is restricted cash tied to the customer advance payments meant for specific capital expenditures on the 2027 data center project, limiting flexibility for general corporate use.

Guidance

H2 2026 Revenue > 50% increase vs H1 2026

Accelerating. With H1 2026 revenue at $22.3M, this implies H2 2026 revenue of at least $33.5M. This steep sequential recovery is entirely dependent on the successful Q3 launch of the new data center commissioning contract and continued aerospace momentum.

FY 2027 Revenue > $100 million

Accelerating. Driven by the massive multi-year data center contract commencing in Q1 2027. This would represent record revenue for the company, significantly higher than the peak $73.3M achieved in FY 2024.

Key Questions

Vessel Charter Autopsy

Given the $4.3M total loss on the terminated vessel charter, what structural changes have been made to your logistics procurement strategy to ensure this level of speculative asset exposure doesn't happen again?

Galveston FID Timeline

With the Coast Guard letter secured but the previous offtaker gone, what is the realistic timeline for securing the necessary 75% capacity contracts required to reach FID on the Galveston facility?

Margin Profile of Data Center Contracts

As data centers become the majority of your revenue mix in 2027, how do the margins on these 'behind-the-meter' supply contracts compare to your legacy marine and industrial business?