Central Puerto (CEPU) Q3 2026 earnings review
Central Puerto buys its own gas, and profit jumps 70%
Argentine power generator Central Puerto earned far more this winter because it now buys much of its own fuel. Its operating profit before depreciation and one-offs rose 70% from a year ago. But by our math the full-year outlook leaves about $74 million for the fourth quarter, less than half the third. Chief executive Fernando Bonnet blamed a long plant overhaul.
| Sales excluding the fuel it bought | $313.8M +16% from last quarter |
|---|---|
| Operating profit before depreciation, excluding one-offs | $185.3M +70% from a year ago |
| Share of fuel it bought itself | 55% 37% last quarter |
| Full-year operating profit outlook | On track $500–550M; the middle leaves about $74M for Q4 |
⚖️ Verdict: 🟢 Bullish
The story got better because the fuel-buying model that a 2025 reform allowed now works at scale. A direct gas deal with Pluspetrol secures supply for its main plant complex until 2028. One caution: contracts made up a smaller share of sales, and Bonnet said wider contracting needs new rules for utilities.
The question now is how much of this winter's fuel profit returns next year. Either private gas deals and pipeline space replace the margin a new cost cap removes, or profit falls back toward pre-reform levels. The third quarter of 2027, the next winter, will settle it.
🐂 Bull Case
Buying Its Own Fuel Lifted Central Puerto's Profit
A 2025 reform let Argentine generators buy their own fuel rather than take it from CAMMESA, the operator of the wholesale power market. Central Puerto now books that fuel as sales and earns a margin on it. Investor relations head Maria Laura Feller named that margin and winter prices as the main drivers of the profit gain.
- Fuel the generator bought itself: 55.3% of all fuel burned, from 18.1% in the first quarter
- Ebitda, operating profit before interest, taxes, depreciation and one-offs: $185.3 million
- Ebitda as a share of sales excluding fuel cost: 59.0%, from 53.6% last quarter, by our math
On October 1 the power producer signed a direct gas deal with Pluspetrol, an oil and gas producer, that runs to December 2028. Feller said the volume "represents approximately half of the gas needed for the average daily operations of the Central Puerto complex".
This matters because the margin no longer depends on gas from the state pool. But high winter prices also helped, so the third quarter overstates what a normal quarter earns.
What to watch: the share of fuel Central Puerto buys itself in the first quarter of 2027, a summer period. A share near half outside winter would show the margin works all year.
New Plants Added Contracted Power
In January Central Puerto finished converting its Brigadier López gas plant into a combined cycle, adding 140 megawatts. Chief executive Fernando Bonnet had put its yearly Ebitda, operating profit before depreciation and one-offs, at $60–65 million.
This quarter the plant produced 371 gigawatt hours more than a year earlier, investor relations head Maria Laura Feller said. Thermal plants under contract sold 5.0% more power than last quarter. New solar farms at Cafayate and San Carlos helped renewables output grow 8.4%.
These volumes matter because buyers pay agreed prices for them, so they hold up when spot prices drop after winter.
What to watch: contracted thermal sales in the fourth quarter, while the Costanera overhaul cuts spot output. Growth there would show the new plants can carry a quarter with fewer units running.
Battery Projects Run Ahead of Schedule
Central Puerto won two battery storage projects in a 2025 government tender, each with a 15-year contract. Battery plants store power and send it back to the grid later. The generator first aimed to start them by mid-2027.
- Construction: 81% complete at Puerto, 87% at Costanera
- Project spending already made: 82% of the total
- Start dates: Costanera before year-end, Puerto in January 2027
Investor relations head Maria Laura Feller said the projects should be "the first to reach commercial operation" in the government's battery programmes. This matters because contracted battery income does not depend on winter spot prices.
What to watch: the Puerto battery's start in January, reported with first-quarter results. An on-time start would mean the 2027 battery income in the outlook begins from the first quarter.
🐻 Bear Case
Full-Year Plan Points to a Weak Fourth Quarter
Chief executive Fernando Bonnet called the period "another quarter of strong execution for Central Puerto". The generator said it is on track for $500–550 million of Ebitda this year, meaning operating profit before interest, taxes, depreciation and one-offs.
By our math, the middle of that range leaves about $74 million for the fourth quarter, 60% below the third. On the call, Bonnet agreed the quarter will fall short of the roughly $100 million an analyst cited for the same period last year. That cuts against the strong-execution message. He expects $75–80 million, more if the weather turns hot.
The causes are planned work and weather, Bonnet said. Gas turbines at the Costanera combined-cycle plant will stop for overhauls of about 60 and 30 days. River flows into the Piedra del Águila dam are falling, so the low-cost hydro output will shrink.
What to watch: fourth-quarter Ebitda, due early in 2027, against the $74 million the plan leaves. A result above it would show the overhaul cost less than the outlook allows.
Contracts Covered a Smaller Share of Sales
The 2025 reform lets Central Puerto sell under contracts, not only at spot prices that swing with the season. Earlier this year, chief executive Fernando Bonnet expected first contracts with distribution companies, which serve homes, in 2026.
None appeared this quarter. Contracts brought in 43% of energy sales, against 51% last quarter, because winter spot sales grew faster.
Bonnet said the generator already sells all it may to large users under the old 20% cap, and the cap rises from April 2027. He added that "reaching the 60% of our thermal capacity, we will need to enter in a contract with distribution companies", and those deals need new rules.
What to watch: the contract share of energy sales in the second quarter of 2027, under the higher cap. A share near 40% would keep profit tied to spot prices.
Fuel Profits Depend on Pipelines and New Rules
Central Puerto can only buy its own gas if it can ship it, and pipeline space is tight in winter. In April it won only part of the firm pipeline space it sought from TGS, a pipeline operator.
Chief executive Fernando Bonnet now aims to cover 40% to 50% of efficient thermal capacity with firm space from TGS and a planned TGN pipeline. He also said Resolution 293, a new cap on the variable production costs generators can claim, will reduce the fuel margin.
Bonnet expects the pipeline space and the Pluspetrol deal to offset that loss. But he said next year's result depends on how cold the winter is, so the margin stays tied to weather and policy.
What to watch: Ebitda in the third quarter of 2027, the first winter under the new cap, set against this winter's result.
Risks this quarter didn't answer
Several standing risks drew new comments on the call but no numbers that settle them. Each item names the reading that would move it.
- Vaca Muerta oil and gas: Bonnet said Central Puerto will develop its blocks without a partner, helped by Radius Energy, a US firm; first test wells will show costs.
- Corralera Noroeste block: the province awarded it in October, with two or three wells due over four years; drilling in 2027 will show its potential.
- Acquisitions: Bonnet said low debt gives "a full flexibility to enter a new acquisition", including state plants; a purchase price would show how far debt climbs.
- Power contract prices: no figure this quarter; a disclosed price would show whether new supply pushes prices down.
👓 Other Themes
Central Puerto Now Reports in US Dollars
Since January, Central Puerto has kept its books in US dollars instead of pesos, because a 2025 reform priced most of its sales in dollars. This quarter it also changed how it converts past peso figures and restated earlier periods. Last year's third-quarter Ebitda now reads $108.8 million, against $101.1 million first reported.
💲 Other KPIs
Debt fell relative to profit: net debt, borrowings minus cash, came to 0.72 times twelve-month Ebitda, against 1.2 times in June. Rising profit did most of the work. Net debt dropped to $343.7 million from $390.8 million in March. Cash on hand covers every maturity through 2028.
The balance CAMMESA still owes under FONINVEMEM, a state fund that financed new power plants, kept shrinking. Collections reached $11.4 million this quarter. The balance stood at $85.7 million, down 19.0% since March, so an old receivable keeps turning into cash.
Investment in plants and assets slowed to $36.7 million after a heavy first half, 6.9% of revenue by our math. Nine-month spending reached $458.6 million, mostly for growth. The 30-year right to run the Piedra del Águila dam took $245.0 million of it, and batteries and oil blocks most of the rest.
🔮 Guidance
Held. The plan puts 2026 Ebitda, operating profit before depreciation and one-offs, at $500–550 million. By our math, the middle of the range leaves about $74 million for the fourth quarter. Central Puerto has already earned 86% of that middle figure, so the year looks within reach despite the Costanera overhaul.
New. The generator expects its two battery plants to add $25–27 million of Ebitda in 2027, their first full year. By our math, that equals about 5% of this year's planned total. Both batteries should start within the next three months.
Raised. Chief executive Fernando Bonnet said the Aguada del Chivato and Aguada de Bocarey blocks need at least $240 million over two years if they join RIGI, a regime with tax and currency benefits. Earlier he spoke of two or three test wells at about $17 million each. He hopes to apply by early 2027.
❓ Key Questions
How much profit came from the fuel margin?
Bonnet's answer on the call gave an unclear range for the year. The split between the fuel margin and winter prices decides how much of this year's Ebitda can repeat in 2027.
What did late 2025 earn after the restatement?
By our math, restated twelve-month Ebitda leaves only $29.3 million for the fourth quarter of 2025. Central Puerto first reported $84.7 million for that quarter. A clear restated figure would show the real yearly growth rate.
When will Central Puerto sign a utility contract?
Bonnet expected contracts with distribution companies this year, and none appeared. He also said such deals need new provincial and federal rules. A date would show whether contract sales can grow before the cap rises in April 2027.
What will each Vaca Muerta test well cost?
Bonnet gave a two-year spending floor if the blocks join RIGI, but no cost per well and no drilling date. Those figures decide how much the oil project adds to debt.
Which state power plants does Central Puerto want?
Bonnet said low debt leaves room to buy hydro and thermal plants the government plans to sell. The size of any bid would show how far debt could climb, and whether a dividend stays on hold.