Borr Drilling (BORR) Q3 2026 earnings review
Borr's earnings recover, but next year's plan shows no growth
Borr Drilling, which rents rigs to oil producers, got its fleet working again but expects no gain next year. Its earnings before interest, tax and depreciation (EBITDA) rose 80% from the second quarter, though sales trailed last year's by 5%. Chief executive Bruno Morand forecasts a similar fourth quarter despite a rig that sank off Gabon. By our math, his plan for 2027 EBITDA to match 2026 means about $290 million.
| Revenue | $263.1M โ5% from a year ago; +13% from last quarter |
|---|---|
| Earnings before interest, tax and depreciation | $78.9M +80% from last quarter; $135.6M a year ago |
| Booked work (backlog) | $1.11B $1.04B at the end of June |
| 2027 earnings outlook | Cut level with 2026, about $290M by our math |
โ๏ธ Verdict: ๐ด Bearish
The story got worse, because the 2027 plan leaves earnings stuck while debt stays heavy. By our math, net debt equals about 7.4 times a year's EBITDA, and lenders agreed to loosen a borrowing limit. The good news: nine new contracts lifted booked work.
The question now is whether Borr can lift earnings enough to shrink its debt. Either better-priced contracts beat the flat 2027 plan, or debt stays where it is. The $200 million insurance payment due November 24, and 2027 bookings in the next report, will tell.
๐ Bull Case
Rigs Returned to Work and Earnings Recovered
Borr Drilling rents out jack-up rigs, drilling platforms for shallow-water oil fields. In the spring several of its rigs sat between contracts, so EBITDA, its earnings before interest, tax and depreciation, sank to a low.
This quarter the fleet averaged 22.9 working rigs, close to the 23 that chief executive Bruno Morand had planned. Morand called the jump in EBITDA "consistent with our expectations".
- Cost of running the rigs: 64.8% of revenue, against 75.4% last quarter
- Charge for unpaid customer bills: $10.8 million smaller than last quarter
But the rebound brings Borr back only to a lower base. Rig running costs still take 18.4 percentage points more of revenue than a year ago, because daily rig fees brought in less while the fleet grew.
What to watch: fourth-quarter EBITDA, which Morand expects to stay "broadly in line with Q3, despite the Prospector 5 impact". A similar result would show the recovery holds without the lost rig.
New Contracts Fill More of 2026 and 2027
Backlog, the value of work customers have signed with Borr, shows how busy its rigs will be in the coming quarters. It shrank in the second quarter.
Since August the driller signed nine commitments worth about $269 million. One of them will "deploy the previously idle rig Hild offshore Nigeria", chief executive Bruno Morand said.
- Backlog: $1.11 billion at September 30, against $1.04 billion in June
- Rig days under contract: 79% for 2026, against 73% in August; 52% for 2027
That matters because Borr bought five rigs from Noble in January. New work for the Sif, Bestla and Joro shows that purchase earning revenue, but half of 2027 still has no work booked.
What to watch: the share of 2027 rig days under contract in the fourth-quarter report. A figure well above half would mean Borr has signed most of its 2027 plan.
Modern Rig Market Tightened Despite Middle East
Jack-ups are drilling rigs for shallow-water oil fields. In May, Borr said worries over secure oil supply were bringing new demand for them in Asia, and this quarter's industry data moved the same way.
Chief executive Bruno Morand now sees "encouraging signs for shallow-water activity", especially in Southeast Asia and West Africa. S&P Global's Petrodata figures support him.
- Modern jack-ups at work, as a share of those offered for hire: 93.2% now, against 90.1% in March
- New rigs under construction: 11, or 2.5% of the global fleet
This matters because few new rigs can arrive to meet that demand. Borr expects that "few of these rigs will join the marketed fleet in the near future", so owners gain room on price.
What to watch: modern rig use in the fourth-quarter report. A reading that holds above 93% would support higher prices on the work Borr still needs for 2027.
๐ป Bear Case
Debt Now Exceeds Seven Times a Year's Earnings
Borr refinanced almost all its debt in June, moving repayment dates into the 2030s. Chief executive Bruno Morand wrote that Borr's "liquidity position provides the financial flexibility to capitalize on opportunities as the market recovers".
The earnings behind that debt have shrunk. Borr owed $2.53 billion of principal at September 30, while cash covered $204 million. It then won lenders' approval to loosen two limits on its $250 million credit line until March 2028.
- Net debt against EBITDA, its earnings before interest, tax and depreciation, over four quarters: about 7.4 times by our math, from 3.9 times a year ago
- New ceiling on that ratio under the credit line: 8.0 times
- New floor for interest cover: 1.2 times; this quarter's EBITDA covered interest expense 1.4 times by our math
This cuts against Morand's claim, because Borr's room to act now rests on lenders' consent. By our simple measure the ratio sits near the new ceiling, and a flat 2027 plan offers no earnings to lower it.
What to watch: the use of the $200 million insurance payment due November 24, shown in the fourth-quarter report. Spending it on rigs instead of repaying debt would leave the ratio near today's level.
A Borr Rig Sank Off Gabon, Ending Its Contract
On October 24 the Prospector 5, one of Borr's jack-up drilling rigs, lost stability and sank off Gabon while preparing to drill for BW Energy. Four people died and one remains missing, the company said. Borr hired DNV, an independent inspection firm, to investigate, because "the cause has not yet been established".
The sinking ended the rig's contract, which ran to July 2027 and held about $45 million of remaining work. Borr does not carry "loss-of-hire insurance for the Prospector 5", cover that would replace the lost income. The lead hull insurer recommended paying the rig's $200 million insured value by November 24.
The standing worry about execution centred on the delayed Odin and rigs coming off contract late in the year. Those risks eased: the Odin started work, and ENI extended the Ran through December 2027. But the sinking exposes a larger operating risk, and Borr is still assessing its financial impact.
What to watch: DNV's findings and any wreck-removal or pollution costs above Borr's liability insurance limits. Costs beyond those limits would come out of the cash the driller needs for its debt.
Middle East Contracts Remain Stuck
The standing concern is that conflict in the Middle East, a large market for jack-ups, would keep big contracts unawarded and push dayrates, the daily rental fee, lower. Chief executive Bruno Morand described "persistent disruptions in the Middle East", and none of the nine new commitments came from there.
But prices on the new work point the other way. By our math the new awards average up to about $138,000 a day, against roughly $123,000 earlier this year. Borr gave no average dayrate across its 2026 contracts, so one set of awards cannot settle the concern.
What to watch: the average dayrate on 2026 and 2027 contracts, which Borr may give on its November 19 call. A figure above August's $134,000 would show the new awards lifting the whole book.
Risks this quarter didn't answer
Four standing concerns got little or no new evidence in Borr's third-quarter results, but each has a figure in the next report that would move it.
- Idle rigs and the new venture: 3 of 28 owned rigs lack work, and BC Ventures, Borr's 50/50 Mexican rig venture, cost it $4.7 million; contracts for the venture's idle rigs would move this.
- Customer credit: the charge for unpaid bills fell to $0.7 million; a new charge on West African or Mexican customers would revive it.
- War-related costs: Borr gave no figure for fuel and insurance costs tied to the Middle East conflict; a disclosed figure would show whether they persist.
- New shares: Borr issued none this quarter; any share sale before earnings recover would reopen the dilution concern.
๐ Other Themes
Borr Sold Its Stake in Mexican Operators
In September Borr sold its 51% stake in Perfomex, the ventures that ran three of its rigs for PEMEX, Mexico's state oil company, to its local partner. The driller keeps the Galar, Gersemi and Njord and rents them out on bareboat charters, leases where the customer runs the rig. The partner will pay $8.7 million from March 2028.
๐ฒ Other KPIs
Cash from operations fell to $31.6 million from $72.1 million a year ago. That covered only 40% of EBITDA. Timing helped, because Borr paid just $1.1 million of interest this quarter. Its unpaid interest bill rose $52.5 million, which the driller will settle in a later quarter.
Borr's share count barely moved this quarter, because it sold no new stock. Two share sales in 2025 still leave the count 8% higher than a year ago. Weighted average shares rose 12%, so each quarter's result spreads across more owners.
Bareboat charter revenue, from leases where the customer runs the rig, rose 36% from a year ago. It climbed for a third quarter in a row, after Borr renewed the Gersemi and Galar charters in January at new blended rates. Charters now supply 14% of the Bermuda driller's sales.
๐ฎ Guidance
Unchanged. Borr's plan keeps fourth-quarter EBITDA level with the third, near $79 million, despite losing the Prospector 5. By our math that still sits 25% below a year ago. It completes the second-half rebound the company first described in May, after the spring's rig changeovers.
Cut. The outlook now has 2027 EBITDA about level with 2026, roughly $290 million by our math. In February Borr expected improved fundamentals and earnings visibility for 2027. The forecast has the first quarter dipping and "a strong ramp-up in Q4", so much of the year rests on late contracts. Both years would sit 38% below 2025.
โ Key Questions
How will Borr use the $200 million insurance payment?
The driller can repay debt, buy equipment or invest the money. The choice decides whether its debt ratio moves away from the new ceiling on its credit line.
What is the average dayrate on 2026 and 2027 contracts?
The results give no average price for booked work. New awards look better priced by our math, and the overall figure would show whether they lift the whole book.
What did the Odin cost to start, and what does it earn?
The Odin's move to the US Gulf took months longer than planned. Borr has not said what the rig earns per day against its running costs, or the total start-up bill.
When will the Mexican venture's idle rigs find work?
BC Ventures cost Borr money in its first quarter, and Borr has lent it $40.9 million. Contracts for its idle rigs would decide whether the venture adds cash or keeps needing loans.
What will the sunken rig cost beyond its insurance?
Insurance covers the hull and third-party claims up to set limits. Borr has not given the rig's book value, the deductibles or the likely cost of removing the wreck.